
Projects
With over a 150+ commissioned sites, Eco Grid is at the forefront of the Green Revolution! See a glimpse of our work below!

4.4 MW Ground Mount at SFL - Unit 3
With around 7,000 solar panels installed, the 4.4MW Ground Mount project in Faisalabad is one of the finest works of our team members.

38KW On-Grid Solution
As a strategic partner of Cheezious Group, Eco Grid Solarized their restaurant at Allama Iqbal town.

336 KW On-Grid Solution
Located in the heart of Pakistan's Textile production center in Sheikhupura, this project powers the Workers colony of Neela Blue.

415 KW Grid Tied - Ground Mount System
Located in Sheikhupura at a textile unit, with one of the most robust ground mounted structures.

40KW at an Office Complex in Johar Town
Located in G3 Block, this 40kW On-grid system generates 59,000kWh p.a, saving the complex PKR 4.7 million annually.

1.25MW On inverted Beams
Located at Neela Blue textile, this 1.25MW System is based on the inverted beam roof with specialized structure.

51KW On-Grid system at Bhagbanpura
Located near Shalimar Gardens, the site required a structure with an elevation of 20ft. A challenge aced by our engineering team with ease.

2.1MW On-Grid Solution
Located near Faisalabad at a Denim unit, this system works seamlessly with gensets, delivering non-stop power.

20kW On-Grid system at Peak Solutions
Located at Mall Road, this 20kW system allows the college to offset 75% of its energy bill each month.

30KW On-Grid Solution
Installed 2 years back, with zero faults to date. Our first collaboration with Cheezious, which put a start to our long-term partnership.

7kW Hybrid Setup
Doesn't matter if your project is small or large, you get the same quality of work. Located at premises of Mr. Haris at Awan Town.

15KW On-Grid Solution with Walkway
Located at 71E Statelife Society, A structure with Purpose! designed with a dedicated walkway and ladder, for easy cleaning.

11KW On-Grid System with Dual Structure
Located at SP. Mr. Ikram Ullah's house, in Jubilee town, where our team deployed dual structure to minimize cost and maximize output.

14KW On-Grid + Hybrid Solution
Located at 230G, Statelife, this project allows the customer to maximize savings and enjoy no disruptions during outages.

11KW Hybrid Solution
A unique site, which required a structure 17ft high from the north edge. Accordingly, our team used higher profile structure.

50kW On-Grid Solution
Another 50kW On-Grid Solution, installed at our strategic clients restaurant in Shadbagh.